NO | KOMPONEN | JENIS PEKERJAAN | KETERANGAN |
| | | |
1 | PEKERJA | 70,000.00 | 1 ORANG/ HR/ 8 JAM |
2 | PEKERJA SETENGAH TERAMPIL | 75,000.00 | 1 ORANG/ HR/ 8 JAM |
3 | PEKERJA TERAMPIL | 82,000.00 | 1 ORANG/ HR/ 8 JAM |
4 | TUKANG GALI | 75,000.00 | 1 ORANG/ HR/ 8 JAM |
5 | TUKANG BATU SETENGAH TERAMPIL | 87,000.00 | 1 ORANG/ HR/ 8 JAM |
6 | TUKANG BATU TERAMPIL | 95,000.00 | 1 ORANG/ HR/ 8 JAM |
7 | KEPALA TUKANG BATU | 100,000.00 | 1 ORANG/ HR/ 8 JAM |
8 | TUKANG KAYU SETENGAH TERAMPIL | 87,000.00 | 1 ORANG/ HR/ 8 JAM |
9 | TUKANG KAYU TERAMPIL | 95,000.00 | 1 ORANG/ HR/ 8 JAM |
10 | KEPALA TUKANG KAYU | 100,000.00 | 1 ORANG/ HR/ 8 JAM |
11 | TUKANG CAT / PELITUR SETENGAH TERAMPIL | 87,000.00 | 1 ORANG/ HR/ 8 JAM |
12 | TUKANG CAT / PELITUR TERAMPIL | 95,000.00 | 1 ORANG/ HR/ 8 JAM |
13 | KEPALA TUKANG CAT / PELITUR | 100,000.00 | 1 ORANG/ HR/ 8 JAM |
14 | TUKANG BESI BETON SETENGAH TERAMPIL | 87,000.00 | 1 ORANG/ HR/ 8 JAM |
15 | TUKANG BESI BETON TERAMPIL | 95,000.00 | 1 ORANG/ HR/ 8 JAM |
16 | KEPALA TUKANG BESI BETON | 100,000.00 | 1 ORANG/ HR/ 8 JAM |
17 | TUKANG BESI PROFIL SETENGAH TERAMPIL | 87,000.00 | 1 ORANG/ HR/ 8 JAM |
18 | TUKANG BESI PROFIL TERAMPIL | 95,000.00 | 1 ORANG/ HR/ 8 JAM |
19 | KEPALA TUKANG BESI PROFIL | 100,000.00 | 1 ORANG/ HR/ 8 JAM |
20 | MANDOR | 130,000.00 | 1 ORANG/ HR/ 8 JAM |
21 | OPERATOR ALAT BESAR | 100,000.00 | 1 ORANG/ HR/ 8 JAM |
22 | PEMBANTU OPERATOR / MEKANIK | 90,000.00 | 1 ORANG/ HR/ 8 JAM |
23 | SUPIR TRUK | 100,000.00 | 1 ORANG/ HR/ 8 JAM |
24 | KENEK TRUK | 80,000.00 | 1 ORANG/ HR/ 8 JAM |
25 | PENJAGA MALAM | 100,000.00 | 1 ORANG/ HR/ 8 JAM |
| | | |
| | | |