RAB Rumah Sederhana Type 50

RAB Rumah Sederhana Type 50


RAB Rumah Sederhana Type 50

NOITEM PEKERJAANVOL SATHARGA SATUAN JUMLAH HARGA
IPEKERJAAN PERSIAPAN
1DIREKSIKEET DAN GUDANG BAHAN 3,00 m2
2PENGUKURAN DAN PASANG BOUWPLANK28,00 m
3FASILITAS DAN PERLENGKAPAN AIR KERJA50,00 m2
SUB TOTAL 1
IIPEKERJAAN TANAH DAN PONDASI
1GALIAN PONDASI BATU KALI 25,90 M3
2PONDASI BATU KALI12,95 M3
3SLOOF 15/20 ( 4d8,d6-200 )
COR BETON SITEMIX 1 : 2 : 31,85 M3
PEMBESIAN277,50 KG
BEKISTING33,30 M2
4URUGAN TANAH KEMBALI12,95 M3
SUB TOTAL 2
IIIPEKERJAAN STRUKTUR BETON
1KOLOM Praktis 10x10 4d8 / d6-20
COR BETON SITEMIX 1 : 2 : 30,44 M3
PEMBESIAN66,00 KG
BEKISTING7,92 M2
2KOLOM Struktur 10/ 20( 6d8, d6-150)
COR BETON SITEMIX 1 : 2 : 30,69 M3
PEMBESIAN103,50 KG
BEKISTING12,42 M2
3RING BALOK 10/15 ( 4d8, d6-200)
COR BETON SITEMIX 1 : 2 : 31,21 M3
PEMBESIAN181,50 KG
BEKISTING21,78 M2
4Plat atap T = 12 cm (d8-150) 2 lapis
COR BETON SITEMIX 1 : 2 : 31,02 M3
PEMBESIAN153,00 KG
BEKISTING18,36 M2
5PELAT KANOPY 10 CM ( d8-150, 1 Lapis )
COR BETON SITEMIX 1 : 2 : 30,86 M3
PEMBESIAN129,00 KG
BEKISTING15,48 M2
SUB TOTAL 3
IVPEKERJAAN PASANGAN DAN PLESTERAN
1PASANGAN BATA MERAH 1/2 BT 1:5 216,00 M2
2PLESTER 1:5 + ACI432,00 M2
SUB TOTAL 4
VPEKERJAAN KUSEN, PINTU, JENDELA , KACA DAN ACCESSORIES
1KUSEN PINTU DAN JENDELA44,50 M
2PINTU JATI PANEL SOLID3,00 UNIT
3PINTU KACA BINGKAI JATI2,00 UNIT
4DAUN JENDELA BESAR2,00 UNIT
5DAUN JENDELA KECIL2,00 UNIT
6HANDLE PINTU5,00 UNIT
7SLOT DAUN JENDELA8,00 UNIT
8HAK ANGIN4,00 UNIT
9ENGSEL DAUN PINTU15,00 BH
10ENGSEL DAUN JENDELA8,00 BH
SUB TOTAL 5
VIPEKERJAAN ATAP
1RANGKA ATAP BAJA RINGAN50,00 M2
2LISPLANK PAPAN16,00 M'
3PENUTUP ATAP GENTENG50,00 M2
4NOK ATAP GENTENG8,00 M'
SUB TOTAL 6
VIIPEKERJAAN PLAFOND
1RANGKA PLAFOND METAL FOORING50,00 M2
2PLAFOND GYPSUM50,00 M2
SUB TOTAL 7
VIIIPEKERJAAN PELAPIS LANTAI DAN DINDING
1PLUR LANTAI50,00 M2
2KERAMIK LANTAI UBUD CREAM 40X4038,30 M2
3KERAMIK LANTAI KAMAR MANDI 20X20 2,70 M2
4KERAMIK LANTAI DAPUR 40x409,00 M2
5KERAMIK DINDING KAMAR MANDI 20x20 ( T = 1.6 M ) POLISH6,10 M2
SUB TOTAL 8
IXPEKERJAAN PENGECATAN
1CAT DINDING INTERIOR368,00 M2
1CAT DINDING EXTERIOR64,00 M2
2CAT KUSEN44,50 M'
3CAT DAUN PINTU3,00 UNIT
4CAT DAUN JENDELA4,00 UNIT
5CAT PLAFOND 50,00 M2
6CAT LISPLANK PAPAN16,00 M'
SUB TOTAL 9
X PEKERJAAN INSTALASI LISTRIK
1INSTALASI TITIK LAMPU10,00 TTK
2INSTALASI STOP KONTAK4,00 TTK
3SAKLAR 10,00 BH
4STOP KONTAK EX. BROCO 4,00 BH
5FITING LAMPU10,00 BH
SUB TOTAL 10
XPEKERJAAN INSTALASI AIR
1INSTALASI AIR BERSIH PIPA PVC 1/2"25,00 M'
2INSTALASI AIR KOTOR PIPA PVC 3"12,00 M'
3INSTALASI AIR KOTOR PIPA PVC 4"10,00 M'
3SEPTIC TANK KAP 1 M3 + RESAPAN1,00 UNIT
SUB TOTAL 10
XIPEKERJAAN SANITAIR
1CLOSET DUDUK1,00 UNIT
2KRAN SHOWER1,00 UNIT
3FLOOR DRAIN 1,00 BH
4KRAN AIR CARPORT DAN TAMAN1,00 BH
SUB TOTAL 12
XIIIPEKERJAAN TAMPAK DEPAN DAN LAIN-LAIN
1PERKERASAN CARPORT12,00 M2
SUB TOTAL 13